Project Reference

List of Projects

S. No. Project Details Client/Utility Remarks / Project Status
1. Installation, Wiring and connectivity of Cyber Security Panels in Sub-Stations SEL/DEWA On-going
2. Design, Testing & commissioning of Supervisory Control & Data Acquisition (SCADA) System ( 3 No. of LDMS & 1 No.s of MCC) at Sub-Station (132/33/11kV S/s Sec-57 & 33/11 kV Phase-I and distribution level on all 11KV General Industrial and Independent Industrial/NDS feeders with commission of FRTUs on RMUs under “OP‟ Circle, Sonepat,UHBVN (Haryana) SCHNEIDER / UHBVN On-going
3. Setting up of testing laboratory for GE SCADA,ABB, GE & SIEMENS RELAY at 400/220 KV Samba Sub-station PGCIL On-going
4. Design , installation, Laying , testing and commissioning of OFC network, Interconnection Between MCC & Station for RMUs & LDMS, Hardware installation of LDMS & Main control centre (MCC) under Smart city project at HSIDC Industrial Area Kundli Haryana HPPL / UHBVN On-going
5. Design, Testing & commissioning of Supervisory Control & Data Acquisition (SCADA) System at Sub-Station (66/11kV S/s of Municipal Corporation Chandigarh HPPL / MC Chandigarh On-going
6. ETC Work of 33/11 KV Sub-station at Bahadurgarh HPPL / HSIIDC On-going
7. Review of Engineering Drawings/Documents /Protections Drawings and documents of Various Level of GIS Sub-stations GOPA INTEC UAE On-going
8. Complete DC Wiring (Testing, laying, termination and commissioning of DC Wire) of 14.3 MW Solar Generating Station at Hero Future Energy site Distt. Jodhpur , Rajasthan Raies Power/ Hartek Power On-going
9. Survey of 33/132/220/400 KV substations in UHBVNL & DHBVNL for implementation of Real-time Data Acquisition System (RT-DAS) of 200 S/s at Haryana State Synergy Systems / UHBVN & DHBVN Completed
10. SCMS Panel installation, Wiring of BCU BMPs and other related SCMS Related work at Various 132/11 KV S/Stn (5 No.s) at Dubai UAE. SEL/DEWA Completed
11. Supply , Installation ,Laying and testing of Fiber Optic Cable and other related work at Various 132/11 KV S/stn (5 No.s) at Dubai UAE SEL/DEWA Completed
12. DEWA SCMS FRAME CONTRACT- Installation testing and commissioning of SCMS System of 132/11 KV S/Stn’s at Dubai UAE. SEL/DEWA Completed
13. Installation testing and commissioning of SCMS System at various Substations at KNPC for 132/11 KV capacity substation at Kuwait SEL/KNPC Completed
14. Providing Engineering Consutancy & Engineering review (SCMS System & other S/S equipments) for Substation Commissioning at MBR Solar Phase 3B- 800 MW PV Solar Plant at Dubai UAE. GOPA INTEC UAE Completed
15. Solar plant inspections at MBR Solar Phase 3B- 800 MW PV Solar Plant at Dubai UAE. GOPA INTEC UAE Completed
16. Installation testing and commissioning of RTUs (Survalent Make) at 132/11 KV substation at Charkhi Dadri Station at Haryana EPI / HVPNL Completed
17. Installation testing and commissioning of 500 No.s of RMUs & RTUs along with supervision in DEWA Phase -II Distribution Automation RTU Project Lucy Electric Dubai Completed
18. Installation Testing & Commissioning of S/s Equipment’s & SCADA Related works at 33kV SS at JSWCF, UAE Vidyut Elect. Dubai Completed
19. Installation testing and commissioning of 2000 No.s of RTUs in DEWA-SRM2000 Distribution Automation RTU Project at Dubai DANWAY/Vidyut/DEWA Completed
20. Training to UEL Staff by DEWA Approved Engineers on SCS SEIMENS WINCC, SICAM, ABB-560 RTU, UEL, OMAN Completed
21. Sub-station Automation System Modification at 765/400 KVA Jhatikara S/S at Haryana. PGCL Completed
22. Installation of various Online Roof top PV solar Plants On-going
23. Supply of Trained Resources (engineers, Technician, Helpers) to various clients for engineering works. On-going